Skip to content

Product Summary

Stop pulling fuses every time you tow. Now you can disconnect your fuse with the flip of a switch. Ths switch provides a safe alternative to the constant removal and reinstallation of the fuse when changing from the towed mode to the driving mode. Utilizing this switch bypasses the towed vehicle's fuse so you can tow your vehicle without draining its battery. It simply relocates your car's fuse with this bypass and integrated switch.

What's Included

    (1) Kit

Features + Benefits

  • Per the manufacturer: Never install a fuse with more than a 20 amp rating in the fuse bypass switch harness. Always match the amperage of the fuse in the fuse bypass switch harness to the fuse removed from the fuse panel.
  • Installs permanently by mounting it near the fuse box
  • Consult the owners manual for the towed vehicle to determine which fuse must be removed from the towed vehicle.
  • 13 inches long

Key Specs

AttributeSpecification

item#

6842014

Brand

Blue Ox

Manufacturer's Warranty

5 year limited warranty

Ship Weight

1.0 LB
AttributeSpecification

Product Type

Wiring Kit

Product Weight

1.0000 lb

Dimensions L x W x H (in.)

16.0 x 12.0 x 5.0 in

Warranty

Manufacturer's Warranty

5 year limited warranty