Skip to content

Free Gift Card Details

$100 Order
$10
gift card
$250 Order
$25
gift card
$500 Order
$50
gift card
$1000 Order
$100
gift card
  • The promo code 290259 must be entered on the Shopping Cart page.
  • To qualify for this offer, your order subtotal must equal $100 or more. Excludes gift cards, free item offers, warranties, Advantage memberships, tax and shipping.
  • Free gift cards will be issued in the form of e-gift cards only, not physical gift cards.
  • E-gift cards will be sent to the email address used in your billing address when your order ships or is picked up.
  • Free e-gift cards expire 04/01/27.
  • Promo code not valid on prior purchases or on Honda and STIHL products and cannot be combined with other promotional offers.
  • Valid online and in participating retail stores.
  • Limited-time offer. Subject to change without notice.

Product Summary

Stop pulling fuses every time you tow. Now you can disconnect your fuse with the flip of a switch. Ths switch provides a safe alternative to the constant removal and reinstallation of the fuse when changing from the towed mode to the driving mode. Utilizing this switch bypasses the towed vehicle's fuse so you can tow your vehicle without draining its battery. It simply relocates your car's fuse with this bypass and integrated switch.

What's Included

    (1) Kit

Features + Benefits

  • Per the manufacturer: Never install a fuse with more than a 20 amp rating in the fuse bypass switch harness. Always match the amperage of the fuse in the fuse bypass switch harness to the fuse removed from the fuse panel.
  • Installs permanently by mounting it near the fuse box
  • Consult the owners manual for the towed vehicle to determine which fuse must be removed from the towed vehicle.
  • 13 inches long

Key Specs

AttributeSpecification

item#

6842014

Brand

Blue Ox

Manufacturer's Warranty

5 year limited warranty

Ship Weight

1.0 LB
AttributeSpecification

Product Type

Wiring Kit

Product Weight

1.0000 lb

Dimensions L x W x H (in.)

16.0 x 12.0 x 5.0 in

Warranty

Manufacturer's Warranty

5 year limited warranty